Skip to content

Prime mover and trailers

Long-haul capacity. Skeletal for boxes, flatbed for anything that will not fit inside one.

Runs from
Taman Panchor Jaya, Seremban
Works across
Every peninsular state, Johor to Perlis
Quoted by
Per trip, by route and by container size
Booked through
One team, one docket, one number
Plate 01 · Taman Panchor JayaA Mercedes-Benz prime mover coupled to a loaded cargo trailer at OKAYA, Panchor Jaya
01Load

What the trailers carry out of Seremban and the ports

Not an exhaustive list. If your load is not on it, describe it and we will say whether this is the unit for it.

The load sheet

Twist-locked or chained to the deck

  1. 0120ft and 40ft containers on skeletal trailers
  2. 02Steel, pipe and long sections on flatbed
  3. 03Plant and machinery on low loader
  4. 04Port runs and long-distance line haul
Plate 02 · Taman Panchor JayaA prime mover coupled to a loaded trailer under the sheds at OKAYA, Panchor Jaya
02Price

How it is priced

The exact figure depends on the load, the access and the day — a Saturday drop onto a site with one gate is not the same job as a weekday run onto open ground. Tell us those three and you get a number.

Quoted by

Per trip, by route and by container size

Ring the yard

016-725 8697

One line for the cranes and the lorries · WhatsApp

Rather write it down? The load, the site and the day, in a form that reaches the same dispatcher.

Send the load and the date
03Questions

Asked before every booking

What gets asked on the phone before anything else.

20ft or 40ft — which do I book?

Go by the box, not by the weight. A 20ft container goes on a 20ft skeletal and a 40ft needs the 40ft. If the cargo is loose rather than containerised — steel, pipe, long sections — it goes on the flatbed, and the longest single piece is what decides the trailer.

Do you do port runs?

Yes. Container work in and out of port and line haul up and down the peninsula is standard prime-mover work. Give us the container number, the depot and the release or closing time, and the run gets planned around that rather than around the driver’s day.

How do I move an excavator or a machine?

On the low loader. What we need before the day is the make and model, the transport weight, and the height and width once it is sitting on the deck. Those three decide whether it is a straight run or a permit job with an escort — and the week before is when that gets sorted, not the morning of.

Plate 03 · Taman Panchor JayaThe driveway out of OKAYA at Panchor Jaya, with units parked under the sheds either side
04Yard

Also in the yard

One phone books any of them. If this is not the unit for the job, the one that is will be on this list.

Send us the load,the site, and the day.

Tell us the loadA number back, not a callback