Prime mover and trailers
Long-haul capacity. Skeletal for boxes, flatbed for anything that will not fit inside one.
- Runs from
- Taman Panchor Jaya, Seremban
- Works across
- Every peninsular state, Johor to Perlis
- Quoted by
- Per trip, by route and by container size
- Booked through
- One team, one docket, one number

What the trailers carry out of Seremban and the ports
Not an exhaustive list. If your load is not on it, describe it and we will say whether this is the unit for it.
The load sheet
Twist-locked or chained to the deck
- 0120ft and 40ft containers on skeletal trailers
- 02Steel, pipe and long sections on flatbed
- 03Plant and machinery on low loader
- 04Port runs and long-distance line haul

How it is priced
The exact figure depends on the load, the access and the day — a Saturday drop onto a site with one gate is not the same job as a weekday run onto open ground. Tell us those three and you get a number.
Quoted by
Per trip, by route and by container size
Ring the yard
016-725 8697One line for the cranes and the lorries · WhatsApp
Rather write it down? The load, the site and the day, in a form that reaches the same dispatcher.
Send the load and the dateAsked before every booking
What gets asked on the phone before anything else.
20ft or 40ft — which do I book?
Go by the box, not by the weight. A 20ft container goes on a 20ft skeletal and a 40ft needs the 40ft. If the cargo is loose rather than containerised — steel, pipe, long sections — it goes on the flatbed, and the longest single piece is what decides the trailer.
Do you do port runs?
Yes. Container work in and out of port and line haul up and down the peninsula is standard prime-mover work. Give us the container number, the depot and the release or closing time, and the run gets planned around that rather than around the driver’s day.
How do I move an excavator or a machine?
On the low loader. What we need before the day is the make and model, the transport weight, and the height and width once it is sitting on the deck. Those three decide whether it is a straight run or a permit job with an escort — and the week before is when that gets sorted, not the morning of.

Also in the yard
One phone books any of them. If this is not the unit for the job, the one that is will be on this list.
- Transport · OKAYA TransportTipper lorryLoose loads in, hydraulic bed up, load out. Earthworks and site clearing.Per trip or per tonne
- Transport · OKAYA TransportCurtain-siderSheeted sides that pull back end to end, so a forklift loads from the kerb instead of the tail.Per trip
- Crane · GS Crane20-tonne mobile craneThe unit that goes out when the load is above a lorry crane and the site still has to stay open.Per day
- Crane · GS Crane7-tonne mobile craneThe one that fits down a housing-estate road. Smaller radius, far easier to set up on a tight lot.Per day
