Tipper lorry
Loose loads in, hydraulic bed up, load out. Earthworks and site clearing.
- Runs from
- Taman Panchor Jaya, Seremban
- Works across
- Every peninsular state, Johor to Perlis
- Quoted by
- Per trip or per tonne
- Booked through
- One team, one docket, one number

What a tipper lorry carries around Seremban
Not an exhaustive list. If your load is not on it, describe it and we will say whether this is the unit for it.
The load sheet
Loaded loose, tipped out on level ground
- 01Sand, aggregate and quarry stone
- 02Road base and crusher run
- 03Excavated earth and spoil off site
- 04Construction debris to the dump
- 05Topsoil and backfill

How it is priced
The exact figure depends on the load, the access and the day — a Saturday drop onto a site with one gate is not the same job as a weekday run onto open ground. Tell us those three and you get a number.
Quoted by
Per trip or per tonne
Ring the yard
016-725 8697One line for the cranes and the lorries · WhatsApp
Rather write it down? The load, the site and the day, in a form that reaches the same dispatcher.
Send the load and the dateAsked before every booking
What gets asked on the phone before anything else.
Per trip or per tonne?
Per trip suits a fixed run — one load of crusher run to one site. Per tonne makes more sense when the quantity is what varies and the destination does not. Tell us the material, where it is coming from and where it is going, and we will quote the way that leaves you with fewer surprises.
Can you bring material in and take spoil out on the same run?
Yes, and it is worth asking for. A tipper that arrives loaded and leaves loaded is one movement instead of two, and the price follows that. It only works when both ends are ready on the same day, so it needs saying at booking, not at the gate.
What does a tipper need in order to tip?
Firm level ground and clear headroom. The bed goes a long way up and it goes up before the load moves, so overhead cables, tree branches, awnings and car-park soffits are the first thing to check. Where the discharge point has no headroom, the load gets dropped short at a spot that does and pushed in from there.

Also in the yard
One phone books any of them. If this is not the unit for the job, the one that is will be on this list.
- Transport · OKAYA TransportCurtain-siderSheeted sides that pull back end to end, so a forklift loads from the kerb instead of the tail.Per trip
- Transport · OKAYA TransportPrime mover and trailersLong-haul capacity. Skeletal for boxes, flatbed for anything that will not fit inside one.Per trip
- Crane · GS Crane20-tonne mobile craneThe unit that goes out when the load is above a lorry crane and the site still has to stay open.Per day
- Crane · GS Crane7-tonne mobile craneThe one that fits down a housing-estate road. Smaller radius, far easier to set up on a tight lot.Per day