Skip to content

7-tonne mobile crane

The one that fits down a housing-estate road. Smaller radius, far easier to set up on a tight lot.

Runs from
Taman Panchor Jaya, Seremban
Works across
Every peninsular state, Johor to Perlis
Quoted by
Per day, or half-day for a single lift
Booked through
One team, one docket, one number
Plate 01 · Taman Panchor JayaThe 7-tonne truck-mounted GS Crane unit at Panchor Jaya with its hook block stowed
01Load

What the 7-tonne crane lifts around Seremban

Not an exhaustive list. If your load is not on it, describe it and we will say whether this is the unit for it.

The load sheet

Slung, lifted and set down on the hook

  1. 01Roof trusses on landed housing
  2. 02Air-conditioning condensers and water tanks to roof level
  3. 03Scaffolding and formwork sets
  4. 04Generator sets and small plant
  5. 05Awning and canopy steel
02Price

How it is priced

The exact figure depends on the load, the access and the day — a Saturday drop onto a site with one gate is not the same job as a weekday run onto open ground. Tell us those three and you get a number.

Quoted by

Per day, or half-day for a single lift

Ring the yard

016-725 8697

One line for the cranes and the lorries · WhatsApp

Rather write it down? The lift, the site and the day, in a form that reaches the same dispatcher.

Send the lift and the date
03Questions

Asked before every booking

What gets asked on the phone before anything else.

Will it get down a taman road?

That is the case it exists for. It sets up on a tight lot with a much smaller footprint than a 20-tonne machine, so a single-carriageway estate road with cars parked down one side is workable. Send a photo of the approach and the frontage on WhatsApp and we will tell you before the day rather than on it.

Can I book it for half a day?

Yes — a single lift is quoted as a half day. Roof trusses on one house, a water tank up to roof level, a condenser set onto a bracket: those are half-day jobs. Once there are several set-downs, or the load is not on site when the crane arrives, the day rate is the honest number.

What has to be ready on site?

Level standing for the outriggers, the load already delivered and ready to sling, and enough clear road for the machine to reverse in and set up. On landed housing the things that stop a lift are almost always overhead — cables, awnings, a neighbour’s tree. Flag those when you book.

Plate 02 · Taman Panchor JayaThe driveway out of OKAYA at Panchor Jaya, with units parked under the sheds either side
04Yard

Also in the yard

One phone books any of them. If this is not the unit for the job, the one that is will be on this list.

Send us the lift,the site, and the day.

Tell us the liftA number back, not a callback